How Do You Roof a House?

Roof Installation Steps:

  • Prepare the roof deck: Remove old roofing if needed. Find roofing material you need. Install drip molding and flash valleys.
  • Put shingles/metal panels: Install ventilation properly. Follow codes and get permits.

Factors to Consider:

  • Project Duration: It takes 2-3 days for a 1600-1700 sq ft home. More area means over a week.
  • Cost Considerations: Asphalt shingles get costly due to oil prices and disposal costs.
  • Signs of Roof Replacement: Curled shingles, leaks, strong winds, and ice dam issues. Self-stick underlayment can help seal out water.
  • Work Challenges: Work is hard in hot weather with heavy lifting. Avoid overloading trusses with double layers. Timing is key. Consider seeking help if needed.

Roof Structure:

  • Roof Types: Pitched roofs have attic floor insulation or a cold attic. Shapes include single slope, gable, hip, half-hip, and tent. Follow manufacturer guidelines.
  • Components: Roof components include rafters for primary support, purlins to strengthen rafters, underlayment as a waterproof barrier, flashing for watertight protection, and shingles for waterproofing and aesthetics.

Installation Details:

  • Proper installation is key to a successful roof replacement, from recognizing signs for replacement to the finished product.
  • Follow precise steps to maximize capabilities and lifespan without problems.

Safety and Tips:

  • Safety is paramount during roofing projects. Always prioritize safety precautions.
  • Dark roofs can impact indoor temperature, so proper attic ventilation and insulation are crucial.

Simplified Steps:

  1. Remove old roof.
  2. Install drip edge.
  3. Lay underlayment.
  4. Apply starter and shingles.