Roof Installation Steps:
- Prepare the roof deck: Remove old roofing if needed. Find roofing material you need. Install drip molding and flash valleys.
- Put shingles/metal panels: Install ventilation properly. Follow codes and get permits.
Factors to Consider:
- Project Duration: It takes 2-3 days for a 1600-1700 sq ft home. More area means over a week.
- Cost Considerations: Asphalt shingles get costly due to oil prices and disposal costs.
- Signs of Roof Replacement: Curled shingles, leaks, strong winds, and ice dam issues. Self-stick underlayment can help seal out water.
- Work Challenges: Work is hard in hot weather with heavy lifting. Avoid overloading trusses with double layers. Timing is key. Consider seeking help if needed.
Roof Structure:
- Roof Types: Pitched roofs have attic floor insulation or a cold attic. Shapes include single slope, gable, hip, half-hip, and tent. Follow manufacturer guidelines.
- Components: Roof components include rafters for primary support, purlins to strengthen rafters, underlayment as a waterproof barrier, flashing for watertight protection, and shingles for waterproofing and aesthetics.
Installation Details:
- Proper installation is key to a successful roof replacement, from recognizing signs for replacement to the finished product.
- Follow precise steps to maximize capabilities and lifespan without problems.
Safety and Tips:
- Safety is paramount during roofing projects. Always prioritize safety precautions.
- Dark roofs can impact indoor temperature, so proper attic ventilation and insulation are crucial.
Simplified Steps:
- Remove old roof.
- Install drip edge.
- Lay underlayment.
- Apply starter and shingles.